City of London Planning Applications

Review City of London planning permission trends by ward, including applications, approval rate and average weeks to decision.

London boroughWard trendsPlanning map

City of London Planning Trends

City of London recorded 2,171 planning applications in this London planning dataset, including 1,583 applications with an approval or refusal decision. Its approval rate is 99.5%, 14.2 percentage points above the London average (higher than average).

Approved applications in City of London took 13.3 weeks on average. That is 4.6 weeks above the London average (slower than average). The ward with the most applications in this dataset is CB, with 231 applications.

Total decisions

1,583

Approval rate

99.5%

Weeks to decision

13.3

City of London total1,583
99.5%
AG70
100.0%
AT30
100.0%
BG89
100.0%
BP140
100.0%
BR17
100.0%
BS69
100.0%
BT30
100.0%
CB170
100.0%
CH35
100.0%
CP36
100.0%
CW35
100.0%
DG16
100.0%
FN141
100.0%
FT150
100.0%
LB40
100.0%
LM41
100.0%
PS15
100.0%
QH15
100.0%
WB42
100.0%
TW108
99.1%
CG73
98.6%
CM104
98.1%
CK42
97.6%
VY32
96.9%
BD43
95.3%

Source: Planning London Datahub. Data covers period April 2025 to July 2026. Approval rate excludes applications still awaiting a decision.

Check planning applications near a specific property

Enter a London postcode, select the address, and open the property report to see nearby planning applications plotted on a map. The report shows application status, proposal details, dates, council records where available, and the planning type such as rear extension, loft conversion, boundary fence or other residential works.

Planning applications map around a London property, showing nearby applications with status markers and a detail popup listing application type and approval status.

Got Questions?

Planning London Datahub. This is a publicly accessible database that brings together planning application and development proposal data from all London Planning Authorities. Data covers period April 2025 to July 2026. See FAQ below for further detail on methodology.

At the moment, this tool only covers London because London has a central planning dataset: the Planning London Datahub. It brings together planning application and development data from London planning authorities in one structured, publicly accessible place. Outside London, planning data is usually spread across hundreds of separate council portals. The only way to obtain this data would be to scrape these portals which can be a legally grey area. So for now, we use official bulk-access data where it is available. We may expand beyond London if more councils provide reliable public downloads or APIs.

Enter a Greater London postcode, select the property address, and open the free property report. The report shows nearby planning applications, decisions, dates, categories and a map where coordinates are available.

Time to approval is the average time between a valid planning application date and the decision date for applications that were approved or granted. Pending applications are not included in this timing measure.

Approval rate is calculated from decided applications only: approved or granted applications divided by approved plus refused applications. Applications still awaiting a decision are excluded.

We use a mix of structured fields from the Planning London Datahub and keyword matching on the application description. One application can have more than one tag. For example, a single-storey rear extension may be tagged as both single_storey and rear_extension. The tags are designed to be directional, not perfect. They help group similar applications, but they may not capture every detail. Where possible, you should review the original council planning record before relying on the information.